Allseas has been awarded a contract by Repsol Norge for the removal, transfer, load-in to shore and disposal of the Gyda platform in the Norwegian North Sea.
The contract covers both the topsides and jacket, and includes an option for reinstallation on another field, as well as an option for the removal and disposal of the jacket’s 32 conductors.
Removal is planned for between late 2020 and 2023, and Allseas will utilise construction vessel Pioneering Spirit for the job.