Asia

Samsung C&T awarded contract to build LNG terminal in Malaysia

Kuala Lumpur: Samsung C&T Corporation, together with Science-Tech Solutions (STS), has been awarded a contract by Petronas Gas to build an LNG regasification terminal in Johor, Malaysia.

Samsung C&T will carry out the engineering, procurement, construction and commissioning (EPCC) work for the regasification terminal, which will have a send-out capacity of 5m tpa and two 200,000 cu m LNG storage tanks.

Construction is expected to be completed by April 2018.

The regasification terminal is part of Malaysia’s development plan to secure a stable natural gas supply for the nearby Refinery and Petrochemical Integrated Development (RAPID), Pengerang Co-generation Plant (PCP) and to the Peninsular Gas Utilisation (PGU) Grid. [26/11/14]

Splash

Splash is Asia Shipping Media’s flagship title offering timely, informed and global news from the maritime industry 24/7.
Back to top button