Subsea 7 has been awarded a major contract by Total E&P Angola for the engineering, procurement, installation and commissioning of the subsea flowlines and umbilicals for the Zinia Phase 2 project, offshore Angola.
The contract scope includes the tie-back development of two reservoirs to the existing Pazflor FPSO in Block 17.
The offshore works are scheduled in 2020 and fabrication will take place in Sonamet’s yard in Lobito, Angola.
“This award recognises our cost effective engineering solutions and our established local presence in Angola. We look forward to maintaining our long-standing and collaborative relationship with Total through our safe and efficient delivery of the Zinia Phase 2 project,” said Gilles Lafaye, Subsea 7’s regional vice president for Africa.