TechnipFMC has been awarded a subsea contract for the Phase 1A Block H Gas Development Project off Sabah, Malaysia by Murphy Sabah Oil.
This contract covers the engineering, procurement, construction, installation and commissioning of the umbilicals, risers and flowlines as well as the transportation and installation of subsea hardware and controls.
Hallvard Hasselknippe, president subsea projects at TechnipFMC, commented: “We are proud to have been awarded this contract from Murphy Sabah Oil which demonstrates the strength of our solutions and deepwater capabilities in Malaysia.”
The Block H Floating LNG project has been sanctioned by Murphy and Petronas with first production due in 2018.