Greater China

Shenhua coal terminal project gets nod

Shanghai: The Guohua coal terminal project of Shenhua Group has been approved by the Ministry of Transport.
The project, located at Zhenjiang port, will house one 50,000 dwt coal unloading berth and three 3,000 dwt loading berths plus supporting facilities. The designed capacity is 9.7m tons per year, and the construction period is 24 months.
Shenhua Group is China’s largest coal industry player. [26/02/14]

Splash

Splash is Asia Shipping Media’s flagship title offering timely, informed and global news from the maritime industry 24/7.
Back to top button